English
  • 中文简体
  • English
  • 日本語
  • 한국어
Home> News>Industry Information>Product Information>Solar scaffolding problem attention

Solar scaffolding problem attention

From:Serve (Xiamen) New Energy Co., Ltd.     Release time:2019-04-25

Overview:Photovoltaic building materials and ballasted solar mounting shall be inspected, cleaned, maintained and maintained by qualified personnel on a regular basis. If the following problems are found, they shall be adjusted or replaced immediately:

Photovoltaic building materials and ballasted solar mounting shall be inspected, cleaned, maintained and maintained by qualified personnel on a regular basis. If the following problems are found, they shall be adjusted or replaced immediately:

Condensation, water ingress and failure of insulating glass affect the line of sight and thermal performance of photovoltaic curtain wall engineering;

Glass bursting, including glass thermal cracking and tempered glass self-explosion;

The coated glass is stripped, resulting in loss of architectural beauty;

The glass is loose, cracked, broken, etc.

2. The drainage system of photovoltaic building materials and photovoltaic components must be kept open and should be dredged regularly.

3. Doors and windows using photovoltaic building materials or photovoltaic components should be opened and closed flexibly. Hardware accessories should be free from dysfunction or damage. Installation bolts or screws should not be loose or invalid.

4. The sealant of photovoltaic building materials and photovoltaic components shall have no bad phenomena such as degumming, cracking and foaming, and the sealing strip shall not fall off or be damaged. If you want to learn more about ballasted solar racking,you can contact us.



Message BoardPlease write down your question and we will respond to you within 24 hours.